Leave Your Message

China Suppliers Factory EP10104 Thick Coated Epoxy Zinc-Rich Anti-Corrosion Primer with Excellent Weather Resistance

Our high-quality product offers exceptional weather resistance and quick drying capabilities, making it ideal for various applications. As a leading factory and suppliers in China, we ensure that our products provide robust cathodic protection, outstanding anti-corrosion and wear resistance, and excellent thick coating application performance. Additionally, our solution minimizes burning during gas cutting and welding processes. With strong adhesion to steel surfaces and great compatibility with a wide range of coatings, you can trust our products to meet your industrial needs

    Product Features
    1
    Good weather resistance, quick drying.
    2
    This product has good cathodic protection, excellent anti-corrosion and wear resistance, and good thick coating construction performance.
    3
    Less burning during gas cutting and welding.
    4
    Strong adhesion to steel surfaces and good compatibility with various coatings.
    Recommended Use
    Mainly used as a primer for coating steel surfaces such as bridges, ships, petrochemical infrastructure, containers, steel structures, etc.
    Product Parameters
    Project Data
    Zinc content (%) 65 75 85
    Density (Kg/L) 2.2 2.3 2.35
    Color Grey
    Solid percentage by volume (%) 52±2 50±2 49±2
    Reference dry film thickness (μm) 75
    Theoretical coating rate (㎡/L) 6.9 6.67 6.67
    Flash point 30°С [86°F]
    Volatile matter (g/L) 418 436 443
    Gloss Flat
    Drying time   10℃ 20℃ 30℃
    Dry to touch 2hrs 1.5hrs 1hr
    Actual drying 24hrs 18hrs 12hrs
    Painting interval   10℃ 20℃ 30℃
    Minimum 24hrs 18hrs 12hrs
    Maximum - - -
    Potlife   10℃ 20℃ 30℃
      10hrs 8hrs 6hrs
    Mixing ratio Base: hardener (10:1 by weight)
    Storage period 12 months 25°C
    Application
    Airless Spraying Parameters
    • Nozzle pressure: 14MPa-21MPa
    • Nozzle hole diameter: 0.6mm-0.8mm
    Surface Treatment & Construction Conditions
    • Remove oil, grease and other contaminants with a suitable cleaning agent.
    • High-pressure water cleaning removes salt, detergents and other contaminants.
    • Surface blasted to Sa 2½ (ISO 8501-1) / SP 10 (SSPC).
    • Remove dust, sand and loose materials.
    • Surface condition (G) (ISO 8503-2).
    • To avoid condensation, please apply on a clean and dry surface with a temperature at least 3°C [5°F] above the dew point.
    • During construction and curing, the surface temperature of the substrate must be above -10°C [14°F].
    • Relative humidity must be below 85% while applying and curing.
    Disclaimer
    The information provided in this manual is the most comprehensive and correct information we have at present. Since the conditions of product use are beyond our control, the information here does not contain any guarantee, that is, we are only responsible to the buyer for the product selection. Due to the continuous development of our company's products and production processes, all information here is subject to our confirmation.
    Frequently Asked Questions (FAQ)
    Q1 What are the primary benefits of this primer?
    This primer features good weather resistance, quick drying properties, excellent cathodic protection, superior anti-corrosion and wear resistance, and strong adhesion to steel surfaces.
    Q2 What surfaces and applications is this product recommended for?
    It is mainly used as a protective primer for coating steel surfaces on structures such as bridges, ships, petrochemical infrastructure, containers, and general steel structures.
    Q3 What is the mixing ratio and potlife of the mixture?
    The mixing ratio for the Base to Hardener is 10:1 by weight. The potlife varies by temperature: 10 hours at 10°C, 8 hours at 20°C, and 6 hours at 30°C.
    Q4 How should the steel surface be prepared before application?
    The surface must be cleaned of oil, grease, salt, and detergents. It should be abrasive blasted to Sa 2½ (ISO 8501-1) or SP 10 (SSPC) standards, and all dust, sand, and loose materials must be completely removed.
    Q5 What are the environmental limits for applying this coating?
    Application should occur on a clean, dry surface with a temperature at least 3°C (5°F) above the dew point. The substrate temperature must be above -10°C (14°F) and relative humidity must remain below 85% during application and curing.
    Q6 What is the drying time and recoating interval at 20°C?
    At 20°C, the coating is dry to the touch in 1.5 hours and fully dry in 18 hours. The minimum painting interval is 18 hours at this temperature.

    Leave Your Message