Leave Your Message

EP40112 Epoxy Ballast Tank Anti-Corrosion Paint (Solvent-Free)

Epoxy ballast tank anticorrosive paint (solvent-free) is a high-performance, environmentally friendly anti-corrosive coating specifically designed for ship ballast tanks. Its most notable feature is the absence of volatile organic compounds (VOC ≈ 0), which meets the increasingly stringent environmental regulations. Additionally, it exhibits excellent long-term anti-corrosive performance and resistance to cathodic disbonding.

    Product Characteristics

    Solvent free, excellent resistance to seawater, thick film type.

    Recommendations

    Used for internal anti-corrosion of ship ballast tanks.

    Product Parameters

    Item Data
    Specific Gravity (Kg/L) 1.6
    Color white
    Volume Solid % 100
    Dry Film Thickness (μm) 150
    Theoretical Coating Rate (㎡/L) 6.7
    Flash Point 143°С [289°F]
    Volatiles (g/L) 0
    Gloss gloss
    Drying Time 20℃
    Dry To Touch 4.5hrs
    Dry To Hard 48hrs
    Coating Interval 20℃
    Min. 72hrs
    Max. 30 d
    Potlife 20℃
    0.5hrs
    Mixing ratio Main agent: curing agent (3:1 volume ratio)
    Storage period 24 months at 25°

    Application

    Construction method:
    Airless spraying
    Nozzle pressure: 14 MPa -21 MPa
    Nozzle hole diameter: 0.6mm-0.8mm
    If spraying work is stopped, the spraying equipment should be cleaned immediately to prevent paint from remaining in the hose, spray gun or spraying equipment, thereby avoiding the solidification of residual paint inside the spraying equipment.
    Surface treatment and construction conditions:
    Use appropriate cleaning agents to remove oil, grease, and other contaminants
    Remove salt, cleaning agents, and other pollutants through high-pressure water cleaning
    Repair and maintenance surface treatment to P3 (ISO 8501-3)
    Dust removal, sand removal, and removal of loose materials.
    The surface of the substrate reaches Medium (G) (ISO 8503-2)
    During construction and curing, the surface temperature of the substrate must be above 10 ° C [50 ° F]
    To avoid condensation, the substrate temperature during construction should be at least 3 ° C [5 ° F] higher than the dew point
    During construction, the product temperature must be above 15 ° C [59 ° F]
    The relative humidity during construction and curing processes must be less than 85%.

    Disclaimer

    The information provided in this manual is the most comprehensive and accurate information currently available to us. Considering that the product usage conditions are beyond our control, this information does not include guarantees and is only responsible to the buyer for selecting the product. Due to the continuous development of our company's products and production processes, all information in this document is subject to our confirmation.

    Leave Your Message